An oil refinery avoid weeks of downtime awaiting installation of a new GRP seawater cooling system pipe by sealing several leaks in a repair completed in two days
Author: SylWrap
South Wales Corroded 20-Metre Long Steel Pipe Bridge Repair & Refurbishment
A dilapidated, corrosion-covered 20-metre long steel pipe bridge crossing the Rhonda River is repaired and refurbished to save a water company the expense of replacement
Libya Water Supply Network Above & Below Ground Live Leak Pipe Repair
Above and underground water supply pipes servicing a town in Libya required live leak repair to seal cracks with minimal disruption to homes and businesses
Puerto Rico Power Station Cooling System Leaking Hydrogen Line Pipe Repair
A hydrogen line newly installed in a power station cooling system undergoes repair and reinforcement after it was found to be leaking from two joints 600mm apart
Saudi Arabia Oil Refinery 400mm GRP Pipeline External Surface Damage Repair
An oil refinery repair surface damage which had weakened a 400mm GRP pipe, strengthening and restoring the integrity of the line to lessen the chance of future leaks
Toilet Waste Pipe Connection & Crack Repair During Bathroom Renovations
A 50mm crack left between a toilet waste pipe and a bathroom floor during renovation work required filling to complete connection of the toilet to the sewer
Domestic Property Bathroom Sink PVC Plastic Drain Pipe Leak Repair
A homeowner makes a quick, easy and inexpensive DIY repair to a cracked PVC plastic pipe leaking from several holes in a cupboard below a bathroom sink
Fire Station Water Pumping House Corroded Steel Pipe Reinforcement
A 6 metre section of 150mm steel pipe containing two elbow bends at a fire station in Saudi Arabia is reinforced before heavy corrosion could breach the line
Quarry Wash Plant 150mm Steel Pipe 90 Degree Elbow Bend Leak Repair
A quarry who previously repaired all leaks on site using clamps required a more versatile method when a pinhole leak developed close to a 90 degree elbow bend
Saudi Arabia Desalination Plant 3000mm Partially Buried FRP Discharge Pipe Repair
Problems during installation of a 3000mm FRP line at a desalination plant left gaps in the partially buried pipe which had to be sealed before the facility could go online